Locations » Pennsylvania » Trades » Construction Laborer

Construction Laborer Prevailing Wage Rates in Pennsylvania (2026)

Construction Laborers on prevailing wage projects in Pennsylvania are paid $46.60 to $53.22 per hour, with a median total of $50.56 across the 50 determination records listed below. That total is base rate plus fringe benefits; the median base rate is $30.57, and among the 50 records listing a fringe separately the median fringe is $19.99. Rates differ by county, construction type and funding source, so use the row that matches your project.

Lowest listed$46.60per hour, total
Median listed$50.56 median base $30.57 · median fringe $19.99
Highest listed$53.22per hour, total
Records shown50 across 10 counties

Figures above are computed over the 50 hourly records in the table below, which is the first page of a larger set. They are not a statewide average of all construction laborers in Pennsylvania. Most recent determination in this set: May 20, 2026.

How much do construction laborers earn on prevailing wage jobs in Pennsylvania?

Every row below is one wage determination line: a construction laborer classification, in one county, for one construction type, under one funding source. The rate that applies to your project is the row whose county, construction type and funding source all match it — a Highway rate does not apply to a Building project in the same county, and a state determination does not substitute for a federal one.

ClassificationCountyConstruction typeFundingBaseFringeTotal
Laborer: Heavy Construction: Group 1 Flag PersonAdamsHeavy#federal$26.61$19.99 $46.60
Laborer: Heavy Construction: Group 2 Hazardous/Toxic/Asbestos Waste Handler, Lead Paint HandlerAdamsHeavy#federal$33.23$19.99 $53.22
Laborer: Heavy Construction: Group 3 Concrete Pitman, Puddlers, Highway Guide Rail Right of Way and Property Fence Slab Reinforcement Placers, Laborers, Landscaper, Seeders, Planters, Magazine Tenders, Laser Beam Men for Pipe Laying and Paving Machines,, Railroad Trackman, Signalman, Asphalt Rakers, Asphalt Tamper, Lute or Screed Man, Pneumatic and Electric Tool Operators, Jackmammers, Paving Breakers, Concrete Saws, Whacker Vibrator, Chainsaw, Highway Concrete Block Layers, Sheet Hammer, Pipe Layers, Walk Behind Rollers, Walk Behind TrencherAdamsHeavy#federal$30.22$19.99 $50.21
Laborer: Heavy Construction: Group 4 Caisson-open Air Below 8 Feet, Cofferdam Open Air Below 8 Feet Where Excavations for Circular Caissons and Cofferdams 8 Ft and Below Level of Natural Grade Adjacent to Starting Point, Form Setters (Road)Wagon Drill Diamond Point Drill, Gunite Nozzle Operators, Walk Behind Rollers and Concrete Rubbers, BlasterAdamsHeavy#federal$30.57$19.99 $50.56
Laborer: Heavy Construction: Group 5 Form Setter, Reinforced Steel Placer, Bonding Aligning and Securing and Burning and Welding in Conjunction Wth Rebar, and Concrete Surfacer.AdamsHeavy#federal$31.24$19.99 $51.23
Laborer: Heavy Construction: Group 1 Flag PersonBerksHeavy#federal$26.61$19.99 $46.60
Laborer: Heavy Construction: Group 2 Hazardous/Toxic/Asbestos Waste Handler, Lead Paint HandlerBerksHeavy#federal$33.23$19.99 $53.22
Laborer: Heavy Construction: Group 3 Concrete Pitman, Puddlers, Highway Guide Rail Right of Way and Property Fence Slab Reinforcement Placers, Laborers, Landscaper, Seeders, Planters, Magazine Tenders, Laser Beam Men for Pipe Laying and Paving Machines,, Railroad Trackman, Signalman, Asphalt Rakers, Asphalt Tamper, Lute or Screed Man, Pneumatic and Electric Tool Operators, Jackmammers, Paving Breakers, Concrete Saws, Whacker Vibrator, Chainsaw, Highway Concrete Block Layers, Sheet Hammer, Pipe Layers, Walk Behind Rollers, Walk Behind TrencherBerksHeavy#federal$30.22$19.99 $50.21
Laborer: Heavy Construction: Group 4 Caisson-open Air Below 8 Feet, Cofferdam Open Air Below 8 Feet Where Excavations for Circular Caissons and Cofferdams 8 Ft and Below Level of Natural Grade Adjacent to Starting Point, Form Setters (Road)Wagon Drill Diamond Point Drill, Gunite Nozzle Operators, Walk Behind Rollers and Concrete Rubbers, BlasterBerksHeavy#federal$30.57$19.99 $50.56
Laborer: Heavy Construction: Group 5 Form Setter, Reinforced Steel Placer, Bonding Aligning and Securing and Burning and Welding in Conjunction Wth Rebar, and Concrete Surfacer.BerksHeavy#federal$31.24$19.99 $51.23
Laborer: Heavy Construction: Group 1 Flag PersonBradfordHeavy#federal$26.61$19.99 $46.60
Laborer: Heavy Construction: Group 2 Hazardous/Toxic/Asbestos Waste Handler, Lead Paint HandlerBradfordHeavy#federal$33.23$19.99 $53.22
Laborer: Heavy Construction: Group 3 Concrete Pitman, Puddlers, Highway Guide Rail Right of Way and Property Fence Slab Reinforcement Placers, Laborers, Landscaper, Seeders, Planters, Magazine Tenders, Laser Beam Men for Pipe Laying and Paving Machines,, Railroad Trackman, Signalman, Asphalt Rakers, Asphalt Tamper, Lute or Screed Man, Pneumatic and Electric Tool Operators, Jackmammers, Paving Breakers, Concrete Saws, Whacker Vibrator, Chainsaw, Highway Concrete Block Layers, Sheet Hammer, Pipe Layers, Walk Behind Rollers, Walk Behind TrencherBradfordHeavy#federal$30.22$19.99 $50.21
Laborer: Heavy Construction: Group 4 Caisson-open Air Below 8 Feet, Cofferdam Open Air Below 8 Feet Where Excavations for Circular Caissons and Cofferdams 8 Ft and Below Level of Natural Grade Adjacent to Starting Point, Form Setters (Road)Wagon Drill Diamond Point Drill, Gunite Nozzle Operators, Walk Behind Rollers and Concrete Rubbers, BlasterBradfordHeavy#federal$30.57$19.99 $50.56
Laborer: Heavy Construction: Group 5 Form Setter, Reinforced Steel Placer, Bonding Aligning and Securing and Burning and Welding in Conjunction Wth Rebar, and Concrete Surfacer.BradfordHeavy#federal$31.24$19.99 $51.23
Laborer: Heavy Construction: Group 1 Flag PersonCarbonHeavy#federal$26.61$19.99 $46.60
Laborer: Heavy Construction: Group 2 Hazardous/Toxic/Asbestos Waste Handler, Lead Paint HandlerCarbonHeavy#federal$33.23$19.99 $53.22
Laborer: Heavy Construction: Group 3 Concrete Pitman, Puddlers, Highway Guide Rail Right of Way and Property Fence Slab Reinforcement Placers, Laborers, Landscaper, Seeders, Planters, Magazine Tenders, Laser Beam Men for Pipe Laying and Paving Machines,, Railroad Trackman, Signalman, Asphalt Rakers, Asphalt Tamper, Lute or Screed Man, Pneumatic and Electric Tool Operators, Jackmammers, Paving Breakers, Concrete Saws, Whacker Vibrator, Chainsaw, Highway Concrete Block Layers, Sheet Hammer, Pipe Layers, Walk Behind Rollers, Walk Behind TrencherCarbonHeavy#federal$30.22$19.99 $50.21
Laborer: Heavy Construction: Group 4 Caisson-open Air Below 8 Feet, Cofferdam Open Air Below 8 Feet Where Excavations for Circular Caissons and Cofferdams 8 Ft and Below Level of Natural Grade Adjacent to Starting Point, Form Setters (Road)Wagon Drill Diamond Point Drill, Gunite Nozzle Operators, Walk Behind Rollers and Concrete Rubbers, BlasterCarbonHeavy#federal$30.57$19.99 $50.56
Laborer: Heavy Construction: Group 5 Form Setter, Reinforced Steel Placer, Bonding Aligning and Securing and Burning and Welding in Conjunction Wth Rebar, and Concrete Surfacer.CarbonHeavy#federal$31.24$19.99 $51.23
Laborer: Heavy Construction: Group 1 Flag PersonColumbiaHeavy#federal$26.61$19.99 $46.60
Laborer: Heavy Construction: Group 2 Hazardous/Toxic/Asbestos Waste Handler, Lead Paint HandlerColumbiaHeavy#federal$33.23$19.99 $53.22
Laborer: Heavy Construction: Group 3 Concrete Pitman, Puddlers, Highway Guide Rail Right of Way and Property Fence Slab Reinforcement Placers, Laborers, Landscaper, Seeders, Planters, Magazine Tenders, Laser Beam Men for Pipe Laying and Paving Machines,, Railroad Trackman, Signalman, Asphalt Rakers, Asphalt Tamper, Lute or Screed Man, Pneumatic and Electric Tool Operators, Jackmammers, Paving Breakers, Concrete Saws, Whacker Vibrator, Chainsaw, Highway Concrete Block Layers, Sheet Hammer, Pipe Layers, Walk Behind Rollers, Walk Behind TrencherColumbiaHeavy#federal$30.22$19.99 $50.21
Laborer: Heavy Construction: Group 4 Caisson-open Air Below 8 Feet, Cofferdam Open Air Below 8 Feet Where Excavations for Circular Caissons and Cofferdams 8 Ft and Below Level of Natural Grade Adjacent to Starting Point, Form Setters (Road)Wagon Drill Diamond Point Drill, Gunite Nozzle Operators, Walk Behind Rollers and Concrete Rubbers, BlasterColumbiaHeavy#federal$30.57$19.99 $50.56
Laborer: Heavy Construction: Group 5 Form Setter, Reinforced Steel Placer, Bonding Aligning and Securing and Burning and Welding in Conjunction Wth Rebar, and Concrete Surfacer.ColumbiaHeavy#federal$31.24$19.99 $51.23
Laborer: Heavy Construction: Group 1 Flag PersonCumberlandHeavy#federal$26.61$19.99 $46.60
Laborer: Heavy Construction: Group 2 Hazardous/Toxic/Asbestos Waste Handler, Lead Paint HandlerCumberlandHeavy#federal$33.23$19.99 $53.22
Laborer: Heavy Construction: Group 3 Concrete Pitman, Puddlers, Highway Guide Rail Right of Way and Property Fence Slab Reinforcement Placers, Laborers, Landscaper, Seeders, Planters, Magazine Tenders, Laser Beam Men for Pipe Laying and Paving Machines,, Railroad Trackman, Signalman, Asphalt Rakers, Asphalt Tamper, Lute or Screed Man, Pneumatic and Electric Tool Operators, Jackmammers, Paving Breakers, Concrete Saws, Whacker Vibrator, Chainsaw, Highway Concrete Block Layers, Sheet Hammer, Pipe Layers, Walk Behind Rollers, Walk Behind TrencherCumberlandHeavy#federal$30.22$19.99 $50.21
Laborer: Heavy Construction: Group 4 Caisson-open Air Below 8 Feet, Cofferdam Open Air Below 8 Feet Where Excavations for Circular Caissons and Cofferdams 8 Ft and Below Level of Natural Grade Adjacent to Starting Point, Form Setters (Road)Wagon Drill Diamond Point Drill, Gunite Nozzle Operators, Walk Behind Rollers and Concrete Rubbers, BlasterCumberlandHeavy#federal$30.57$19.99 $50.56
Laborer: Heavy Construction: Group 5 Form Setter, Reinforced Steel Placer, Bonding Aligning and Securing and Burning and Welding in Conjunction Wth Rebar, and Concrete Surfacer.CumberlandHeavy#federal$31.24$19.99 $51.23
Laborer: Heavy Construction: Group 1 Flag PersonDauphinHeavy#federal$26.61$19.99 $46.60
Laborer: Heavy Construction: Group 2 Hazardous/Toxic/Asbestos Waste Handler, Lead Paint HandlerDauphinHeavy#federal$33.23$19.99 $53.22
Laborer: Heavy Construction: Group 3 Concrete Pitman, Puddlers, Highway Guide Rail Right of Way and Property Fence Slab Reinforcement Placers, Laborers, Landscaper, Seeders, Planters, Magazine Tenders, Laser Beam Men for Pipe Laying and Paving Machines,, Railroad Trackman, Signalman, Asphalt Rakers, Asphalt Tamper, Lute or Screed Man, Pneumatic and Electric Tool Operators, Jackmammers, Paving Breakers, Concrete Saws, Whacker Vibrator, Chainsaw, Highway Concrete Block Layers, Sheet Hammer, Pipe Layers, Walk Behind Rollers, Walk Behind TrencherDauphinHeavy#federal$30.22$19.99 $50.21
Laborer: Heavy Construction: Group 4 Caisson-open Air Below 8 Feet, Cofferdam Open Air Below 8 Feet Where Excavations for Circular Caissons and Cofferdams 8 Ft and Below Level of Natural Grade Adjacent to Starting Point, Form Setters (Road)Wagon Drill Diamond Point Drill, Gunite Nozzle Operators, Walk Behind Rollers and Concrete Rubbers, BlasterDauphinHeavy#federal$30.57$19.99 $50.56
Laborer: Heavy Construction: Group 5 Form Setter, Reinforced Steel Placer, Bonding Aligning and Securing and Burning and Welding in Conjunction Wth Rebar, and Concrete Surfacer.DauphinHeavy#federal$31.24$19.99 $51.23
Laborer: Heavy Construction: Group 1 Flag PersonJuniataHeavy#federal$26.61$19.99 $46.60
Laborer: Heavy Construction: Group 2 Hazardous/Toxic/Asbestos Waste Handler, Lead Paint HandlerJuniataHeavy#federal$33.23$19.99 $53.22
Laborer: Heavy Construction: Group 3 Concrete Pitman, Puddlers, Highway Guide Rail Right of Way and Property Fence Slab Reinforcement Placers, Laborers, Landscaper, Seeders, Planters, Magazine Tenders, Laser Beam Men for Pipe Laying and Paving Machines,, Railroad Trackman, Signalman, Asphalt Rakers, Asphalt Tamper, Lute or Screed Man, Pneumatic and Electric Tool Operators, Jackmammers, Paving Breakers, Concrete Saws, Whacker Vibrator, Chainsaw, Highway Concrete Block Layers, Sheet Hammer, Pipe Layers, Walk Behind Rollers, Walk Behind TrencherJuniataHeavy#federal$30.22$19.99 $50.21
Laborer: Heavy Construction: Group 4 Caisson-open Air Below 8 Feet, Cofferdam Open Air Below 8 Feet Where Excavations for Circular Caissons and Cofferdams 8 Ft and Below Level of Natural Grade Adjacent to Starting Point, Form Setters (Road)Wagon Drill Diamond Point Drill, Gunite Nozzle Operators, Walk Behind Rollers and Concrete Rubbers, BlasterJuniataHeavy#federal$30.57$19.99 $50.56
Laborer: Heavy Construction: Group 5 Form Setter, Reinforced Steel Placer, Bonding Aligning and Securing and Burning and Welding in Conjunction Wth Rebar, and Concrete Surfacer.JuniataHeavy#federal$31.24$19.99 $51.23
Laborer: Heavy Construction: Group 1 Flag PersonLackawannaHeavy#federal$26.61$19.99 $46.60
Laborer: Heavy Construction: Group 2 Hazardous/Toxic/Asbestos Waste Handler, Lead Paint HandlerLackawannaHeavy#federal$33.23$19.99 $53.22
Laborer: Heavy Construction: Group 3 Concrete Pitman, Puddlers, Highway Guide Rail Right of Way and Property Fence Slab Reinforcement Placers, Laborers, Landscaper, Seeders, Planters, Magazine Tenders, Laser Beam Men for Pipe Laying and Paving Machines,, Railroad Trackman, Signalman, Asphalt Rakers, Asphalt Tamper, Lute or Screed Man, Pneumatic and Electric Tool Operators, Jackmammers, Paving Breakers, Concrete Saws, Whacker Vibrator, Chainsaw, Highway Concrete Block Layers, Sheet Hammer, Pipe Layers, Walk Behind Rollers, Walk Behind TrencherLackawannaHeavy#federal$30.22$19.99 $50.21
Laborer: Heavy Construction: Group 4 Caisson-open Air Below 8 Feet, Cofferdam Open Air Below 8 Feet Where Excavations for Circular Caissons and Cofferdams 8 Ft and Below Level of Natural Grade Adjacent to Starting Point, Form Setters (Road)Wagon Drill Diamond Point Drill, Gunite Nozzle Operators, Walk Behind Rollers and Concrete Rubbers, BlasterLackawannaHeavy#federal$30.57$19.99 $50.56
Laborer: Heavy Construction: Group 5 Form Setter, Reinforced Steel Placer, Bonding Aligning and Securing and Burning and Welding in Conjunction Wth Rebar, and Concrete Surfacer.LackawannaHeavy#federal$31.24$19.99 $51.23
Laborer: Heavy Construction: Group 1 Flag PersonLancasterHeavy#federal$26.61$19.99 $46.60
Laborer: Heavy Construction: Group 2 Hazardous/Toxic/Asbestos Waste Handler, Lead Paint HandlerLancasterHeavy#federal$33.23$19.99 $53.22
Laborer: Heavy Construction: Group 3 Concrete Pitman, Puddlers, Highway Guide Rail Right of Way and Property Fence Slab Reinforcement Placers, Laborers, Landscaper, Seeders, Planters, Magazine Tenders, Laser Beam Men for Pipe Laying and Paving Machines,, Railroad Trackman, Signalman, Asphalt Rakers, Asphalt Tamper, Lute or Screed Man, Pneumatic and Electric Tool Operators, Jackmammers, Paving Breakers, Concrete Saws, Whacker Vibrator, Chainsaw, Highway Concrete Block Layers, Sheet Hammer, Pipe Layers, Walk Behind Rollers, Walk Behind TrencherLancasterHeavy#federal$30.22$19.99 $50.21
Laborer: Heavy Construction: Group 4 Caisson-open Air Below 8 Feet, Cofferdam Open Air Below 8 Feet Where Excavations for Circular Caissons and Cofferdams 8 Ft and Below Level of Natural Grade Adjacent to Starting Point, Form Setters (Road)Wagon Drill Diamond Point Drill, Gunite Nozzle Operators, Walk Behind Rollers and Concrete Rubbers, BlasterLancasterHeavy#federal$30.57$19.99 $50.56
Laborer: Heavy Construction: Group 5 Form Setter, Reinforced Steel Placer, Bonding Aligning and Securing and Burning and Welding in Conjunction Wth Rebar, and Concrete Surfacer.LancasterHeavy#federal$31.24$19.99 $51.23

WageFinder holds more construction laborer records for Pennsylvania than fit on this page. Open a county below, or search all Pennsylvania construction laborers.

What does the construction laborer classification cover?

The laborer classification covers general construction work not reserved to a specific trade, and it is almost always the most heavily subdivided entry on a wage determination — common/general, mason tender, pipelayer, flagger, asphalt raker and landscape laborer can all carry different rates on the same document. The "Common or General" rate is the floor, not a universal rate.

Work typically covered

  • Site clearing and cleanup
  • Mason tending
  • Pipelaying
  • Flagging and traffic control
  • Asphalt and concrete support work

Also listed as

  • Laborer: Common or General
  • Mason Tender
  • Pipelayer
  • Flagger

In this Pennsylvania result set the work appears under 5 distinct classification names.

Construction Laborer rates by county in Pennsylvania

Prevailing wage is set county by county. These are the Pennsylvania counties with construction laborer records in the set above — open one to see every classification on that county's determination, not just this trade.

See all Pennsylvania counties →

Other trades in Pennsylvania

Construction Laborer prevailing wage questions

What is the prevailing wage for a construction laborer in Pennsylvania?

Across the 50 federal-funded determination records WageFinder lists for construction laborers in Pennsylvania, total prevailing wage runs from $46.60 to $53.22 per hour, median $50.56. There is no single statewide figure: each county's determination sets its own rate, and the same county can carry different rates for Building, Highway, Heavy and Residential work.

Does the construction laborer rate include benefits?

The total prevailing wage shown is the base hourly rate plus the fringe benefit rate. Of the 50 Pennsylvania records on this page, 50 list a fringe amount separately, with a median of $19.99 per hour — roughly 40% of the median total. The rest list no separate fringe, meaning the base rate is the whole obligation. Fringe can be paid as bona fide benefit plan contributions, as cash added to the paycheck, or as a mix of both.

Which Pennsylvania counties have construction laborer rates?

This page lists construction laborer records for 10 counties in Pennsylvania: Adams, Berks, Bradford, Carbon, Columbia, Cumberland, Dauphin, Juniata, Lackawanna, Lancaster. Determinations that apply statewide appear under a statewide entry rather than a named county.

How current are these Pennsylvania construction laborer rates?

The most recent determination in this set is dated May 20, 2026. WageFinder re-reads the official sources weekly, but the date that matters for compliance is the determination date on the document itself, which is shown on every wage detail page and links back to the government source.