Free Prevailing Wage Look-Up For Davis Bacon Projects

Free prevailing wage look-up for Davis Bacon projects. Save time using our WageFinder look-up tool for current or new projects.

View current prevailing wage rates updated weekly from official government sources including SAM.gov.

HomeNevada#federal – Laborers: Group 3a (Concrete Specialist; Setting Screeds; Screed Pins; Curb Forms and Curb and Gutter Forms; Using Darby and Push Floats; Hand Trowels or Hand Floating; Marking Edging; Using Base Cove or Step Tools; Spreading and Finishing Gypsum; Concrete Grinding Machines (the Terms Do Not Include Rotomill Machines for Highway Overlay Grinding); Troweling Machines; Floating Machines; Finishing of Epoxy or Resin Materials; Operation of Skill Saw; Laser Screed; Laser Level; Curb and Slipform Machines; Stamps or Other Means or Texturing; Any New Devices Which Are Beneficial to the Construction of or With Concrete or Related Products.) in Washoe County, Nevada – Highway Construction
Highway Construction#Federal Funding

Prevailing Wage For Laborers: Group 3a (Concrete Specialist; Setting Screeds; Screed Pins; Curb Forms and Curb and Gutter Forms; Using Darby and Push Floats; Hand Trowels or Hand Floating; Marking Edging; Using Base Cove or Step Tools; Spreading and Finishing Gypsum; Concrete Grinding Machines (the Terms Do Not Include Rotomill Machines for Highway Overlay Grinding); Troweling Machines; Floating Machines; Finishing of Epoxy or Resin Materials; Operation of Skill Saw; Laser Screed; Laser Level; Curb and Slipform Machines; Stamps or Other Means or Texturing; Any New Devices Which Are Beneficial to the Construction of or With Concrete or Related Products.) In Washoe, Nevada

WageFinder updated this rate on Monday, June 22, 2026

Publish date according to source website:

06/22/2026

The Total Prevailing Wage For A Laborers: Group 3a (Concrete Specialist; Setting Screeds; Screed Pins; Curb Forms and Curb and Gutter Forms; Using Darby and Push Floats; Hand Trowels or Hand Floating; Marking Edging; Using Base Cove or Step Tools; Spreading and Finishing Gypsum; Concrete Grinding Machines (the Terms Do Not Include Rotomill Machines for Highway Overlay Grinding); Troweling Machines; Floating Machines; Finishing of Epoxy or Resin Materials; Operation of Skill Saw; Laser Screed; Laser Level; Curb and Slipform Machines; Stamps or Other Means or Texturing; Any New Devices Which Are Beneficial to the Construction of or With Concrete or Related Products.) In Washoe, Nevada Is $56.71 per hour*.

Data Source: SAM Government wages from https://sam.gov/wage-determination/NV20260110/0

* Minimum wages may apply, and in some cases are higher than the prevailing wage listed.

$56.71
$39.13 Rate, $17.58 Fringes
per hour
← Previous#federal – Laborers: Group 1 (All Cleanup Work of Debris, Grounds, and Building Including Windows and Tile; Dumpmen or Spotter (other Than Asphalt); Handling and Servicing of Flares; General Laborer; Guideposts and Highway Signs; Guardrail Erection and Dismantling; Limber, Brushloader and Piler; Pavement Marking and Highway Striping; Traffic Barrier Erector; Tending to Portable Space Heaters; Profilograph Work All Types Manual, Self Propelled or Carts; Gabion Basket, Building, Handling, Installation and Rigging; Dry Set Paver Work; Traffic Barrier Erector) in Washoe County, Nevada – Highway ConstructionNext →#federal – Laborers: Group 3 (Asphalt Workers (ironers, Shovelers, Cutting Machine); Buggymobile; Chainsaw, Faller, Logloader and Bucker; Compactor (All Types); Concrete Mixer Under 1/2 Yard; Concrete Pan Work (Breadpan Type), Handling, Cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider Machine; Curb Setter (Precast or Cut); Ditching Machine (Hand-guided); Drillers Helper, Chuck Tender; Fence Erector Including Safety, Chain Link, Turtle, Field and Barbe Wire Fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (Wet or Dry); Pipewrapper, Kettlemen, Potmen, and Men Applying Asphalt, Creosote and Similar Type Materials; All Power Tools (Air, Gas, or Electric), Post Driver; Riprap-stonepaver and Rockslinger, Including Placing of Sack Concrete Wet or Dry Rototiller; Rigging and Signaling in Connection With Laborers' Work; Sandblaster, Potmen, Gunmen or Nozzlemen Water Blasting Not Covered in Group 6; Vibra-screed; All Demolition and Wrecking Work Including but Not Limited to Any Torch Work Cutting, Burning, Plasma Are, Dust Control, and Salvaging (Removing and Salvaging of All Materials, Windows, Doors, Plumbing, and Electrical Fixtures)And Use of Customary Tools and Equipment for Demolition and Wrecking; All Underpinning Foundation Work, Digging and Underpinning Pits, Removal of Debris With Tuggers or Other Methods, Cutting, Handling and Installing All Shoring Boards and Lagging Boards Used for Underpinning and Foundation Work, Placement and Tying of Steel Reinforcing for Underpinning Piers, All Tiebacks and Soil Nail Work Drilling and Grouting, All Soldier Beam Work and Us of Customary Tools and Equipment for Underpinning Foundation Work) in Washoe County, Nevada – Highway Construction

How this rate compares in Washoe County

At $56.71 per hour, the Laborers: Group 3a (Concrete Specialist; Setting Screeds; Screed Pins; Curb Forms and Curb and Gutter Forms; Using Darby and Push Floats; Hand Trowels or Hand Floating; Marking Edging; Using Base Cove or Step Tools; Spreading and Finishing Gypsum; Concrete Grinding Machines (the Terms Do Not Include Rotomill Machines for Highway Overlay Grinding); Troweling Machines; Floating Machines; Finishing of Epoxy or Resin Materials; Operation of Skill Saw; Laser Screed; Laser Level; Curb and Slipform Machines; Stamps or Other Means or Texturing; Any New Devices Which Are Beneficial to the Construction of or With Concrete or Related Products.) rate in Washoe County is about 27% below the county median of $78.06, and ranks 38 of 50 classifications by total prevailing wage.

Laborers: Group 3a (Concrete Specialist; Setting Screeds; Screed Pins; Curb Forms and Curb and Gutter Forms; Using Darby and Push Floats; Hand Trowels or Hand Floating; Marking Edging; Using Base Cove or Step Tools; Spreading and Finishing Gypsum; Concrete Grinding Machines (the Terms Do Not Include Rotomill Machines for Highway Overlay Grinding); Troweling Machines; Floating Machines; Finishing of Epoxy or Resin Materials; Operation of Skill Saw; Laser Screed; Laser Level; Curb and Slipform Machines; Stamps or Other Means or Texturing; Any New Devices Which Are Beneficial to the Construction of or With Concrete or Related Products.) against all 50 classifications on Washoe County determinations
This classification$56.71Laborers: Group 3a (Concrete Specialist; Setting Screeds; Screed Pins; Curb Forms and Curb and Gutter Forms; Using Darby and Push Floats; Hand Trowels or Hand Floating; Marking Edging; Using Base Cove or Step Tools; Spreading and Finishing Gypsum; Concrete Grinding Machines (the Terms Do Not Include Rotomill Machines for Highway Overlay Grinding); Troweling Machines; Floating Machines; Finishing of Epoxy or Resin Materials; Operation of Skill Saw; Laser Screed; Laser Level; Curb and Slipform Machines; Stamps or Other Means or Texturing; Any New Devices Which Are Beneficial to the Construction of or With Concrete or Related Products.)
County median$78.06across all classifications in the county
County range$47.87 – $98.31lowest to highest total prevailing wage
Fringe share31%$17.58 of the $56.71 total

Of that total, $39.13 is base cash wage and $17.58 is fringe. Fringe may be satisfied with bona fide benefit plan contributions, paid in cash, or a mix — but it is owed either way, and it is owed at straight time on overtime hours.

Compare Laborers: Group 3a (Concrete Specialist; Setting Screeds; Screed Pins; Curb Forms and Curb and Gutter Forms; Using Darby and Push Floats; Hand Trowels or Hand Floating; Marking Edging; Using Base Cove or Step Tools; Spreading and Finishing Gypsum; Concrete Grinding Machines (the Terms Do Not Include Rotomill Machines for Highway Overlay Grinding); Troweling Machines; Floating Machines; Finishing of Epoxy or Resin Materials; Operation of Skill Saw; Laser Screed; Laser Level; Curb and Slipform Machines; Stamps or Other Means or Texturing; Any New Devices Which Are Beneficial to the Construction of or With Concrete or Related Products.) rates elsewhere

Questions about this rate

What is the prevailing wage for a Laborers: Group 3a (Concrete Specialist; Setting Screeds; Screed Pins; Curb Forms and Curb and Gutter Forms; Using Darby and Push Floats; Hand Trowels or Hand Floating; Marking Edging; Using Base Cove or Step Tools; Spreading and Finishing Gypsum; Concrete Grinding Machines (the Terms Do Not Include Rotomill Machines for Highway Overlay Grinding); Troweling Machines; Floating Machines; Finishing of Epoxy or Resin Materials; Operation of Skill Saw; Laser Screed; Laser Level; Curb and Slipform Machines; Stamps or Other Means or Texturing; Any New Devices Which Are Beneficial to the Construction of or With Concrete or Related Products.) in Washoe County, Nevada?

$56.71 per hour total — $39.13 base rate plus $17.58 in fringe benefits — under the federal determination covering highway construction in Washoe County, Nevada, dated Monday, June 22, 2026.

Does this rate apply to every project in Washoe County?

No. It applies to highway construction under federal funding. The same county carries different rates for Building, Residential, Highway and Heavy work, and a state or city determination may apply instead of or alongside the federal one. Match all three — classification, construction type and funding source — before using a rate.

Is the fringe benefit amount included in the $56.71?

Yes. $56.71 is the base rate of $39.13 plus $17.58 of fringe. The fringe can be paid into bona fide benefit plans, paid as cash wages, or split between the two.

Where does this Laborers: Group 3a (Concrete Specialist; Setting Screeds; Screed Pins; Curb Forms and Curb and Gutter Forms; Using Darby and Push Floats; Hand Trowels or Hand Floating; Marking Edging; Using Base Cove or Step Tools; Spreading and Finishing Gypsum; Concrete Grinding Machines (the Terms Do Not Include Rotomill Machines for Highway Overlay Grinding); Troweling Machines; Floating Machines; Finishing of Epoxy or Resin Materials; Operation of Skill Saw; Laser Screed; Laser Level; Curb and Slipform Machines; Stamps or Other Means or Texturing; Any New Devices Which Are Beneficial to the Construction of or With Concrete or Related Products.) rate come from?

It is taken from the federal wage determination published on the official government source, linked above. WageFinder re-reads those sources weekly and does not alter the rates. For compliance, the government determination is the authoritative document.

Running certified payroll against this rate?

HCM TradeSeal automates certified payroll and wage compliance against these determinations. The WageFinder lookup stays free; programmatic and bulk access runs through the API.

Get an Evaluation API Key